wmcquade

If we are losing the blue box program what is the justification for Solid Waste Administration facility growth in 2028-2033? Is there a business case for this?

Reply
wmcquade

The Administration Facilities at Solid Waste have been over capacity since 2010 and portables are currently being used for additional space.  In 2018, the solid waste facility needs assessment was completed and a preliminary design was completed in 2021 for recommended renovations.  The project was deferred in 2023 as there is an opportunity for Solid Waste to move into the existing Guelph Transit facility at 170 Watson Rd once vacated by Transit in 2030.  Integral with the Operational Facilities long term plan, staff continue to investigate how to best utilize existing space available to save the City money.

Reply
Dominique O’Rourke
Is the administration permitted a hybrid work arrangement? If so, does an expansion remain necessary?
Reply
wmcquade

Yes, where applicable hybrid work arrangements are in place. The administration facilities at Solid Waste have been over capacity since 2010 and portables are being used. This determination was confirmed through the 2018 solid waste facility needs assessment and a preliminary design was completed in 2021 for renovations.  The project was deferred in 2023 when the opportunity to use 170 Watson Rd was identified in the operations facilities long term plan. Staff are currently investigating how to best use existing space available, inclusive of hybrid work arrangements, to save the City money. The conceptual cost is based on the preliminary design work and consultant recommendations for existing growth projections. Staff continue to refine costs and look for opportunities to optimize the design for both the solid waste admin and operations facilities as the design progresses through detailed design. While this project is currently outside of the multi budget, placeholders are in the 10 year capital plan with  $1M in 2028 for design, $7M in 2029 for construction.  

Reply
Reply