Daisy Zhang DaisyZhang
Is there a list of the Sidewalk projects that are moving forward and what might be delayed? Specifically inquiring about Ridgeway Cres and Malvern Cres.
Reply
Daisy Zhang DaisyZhang
The list of active sidewalk projects is available at https://guelph.ca/living/getting-around/cycling-and-walking/ (see the ‘Adding Sidewalks' section). Staff select projects to move forward to construction at the beginning of each year, depending on the funding available. In recent years, the City has typically constructed 1-4 segments of sidewalk per year through the Sidewalk Infill program. The reduced funding for New Sidewalk Construction means slower progress on completing segments of sidewalk construction, but staff cannot specify which segments will be delayed.
 
The City prioritizes sidewalk infill based on the 2017 Sidewalk Needs Assessment Study, which ranked all the missing sections of sidewalk across the City (projects could score a maximum of 52 points). Ridgeway Avenue and Malvern Crescent are both identified in the Study as needing sidewalk. Malvern Crescent has a score of 17 points and Ridgeway Avenue has a score of less than 14 points. Staff are currently working on design and construction of projects with scores of 20-25 points. As such, the City does not currently have any plans to install sidewalk on Ridgeway Avenue or Malvern Cresent in the near future.
Reply
Reply