Rodrigo Goller
The draft budget removed a $950k transfer to the 100RE reserve (GG0261), for a total reduction of $17.85M over the next 10 years.
 
How will this impact the City of Guelph’s ability to meet our target of becoming a net zero community?
 
Can you please let me know what types of projects were funded from this reserve in 2024 and 2025?
 
I would like to understand what will not be getting done due to this funding reduction. Specifically, without this funding, if a natural gas furnace breaks in a City Facility in 2026, will it be replaced with another natural gas furnace? Or, regardless of this budget reduction, when gas-powered equipment breaks and needs to be replaced, will it be replaced with heat pumps and other electric-powered equipment that will help us meet our gas emissions reduction targets?
Reply
Daisy Zhang DaisyZhang
The removal of GG0261 over the next 10 years means projects that increase energy efficiency throughout municipal operations such as building envelope and HVAC upgrades and solar PV will not proceed. The replacement of equipment during lifecycle renewal or emergency failure with more efficient options will occur to the extent existing infrastructure -such as structure and electrical capacity - is sufficient to support the upgrade.
 
While there is a reduction in funding for 100RE, the City will continue to make environmentally conscious investments in other areas as the budget has continued investment in public transit and fleet electrification with expanded storage and charging capacity of transit buses. These investments will provide a significant reduction in greenhouse gases (GHGs) by City operations. In addition, energy conservation and GHG reduction measures will be implemented where asset renewal and new building funding supports. Staff will also look for grant opportunities to move some of the building envelope, HVAC, and solar PV work forward. This will impact the City’s pace of progress on the 100RE and Race to Zero goals.  
 
Staff plan to report to council in Q1, 2026 to present a plan to meet the City’s interim target for Race to Zero and 100 RE Goals.
Reply
Daisy Zhang DaisyZhang
Follow up question( asked by Cllr Goller)
What would be the minimum viable budget to allow the City to continue replacing emission-generating equipment with zero-emission alternatives – not proactively as we have done in the past, but at least when that equipment comes to it’s end of life. Would $100k per year be sufficient to support this work, or would more funds be required annually? Again, I understand that we will not be able to proactively install solar panels and other new equipment. However, I’m trying to understand what level of funding would be required to ensure that at least when equipment comes to it’s end of life or suddenly breaks down and needs major repairs or replacement, that your team has the resources to upgrade to zero-emissions alternatives, instead of installing new gas-burning or low-energy-efficiency equipment.
 
Reply
Daisy Zhang DaisyZhang
Follow up question( asked by Cllr Goller)
What would be the minimum viable budget to allow the City to continue replacing emission-generating equipment with zero-emission alternatives – not proactively as we have done in the past, but at least when that equipment comes to it’s end of life. Would $100k per year be sufficient to support this work, or would more funds be required annually? Again, I understand that we will not be able to proactively install solar panels and other new equipment. However, I’m trying to understand what level of funding would be required to ensure that at least when equipment comes to it’s end of life or suddenly breaks down and needs major repairs or replacement, that your team has the resources to upgrade to zero-emissions alternatives, instead of installing new gas-burning or low-energy-efficiency equipment.
 

Providing definitive numbers is challenging because forecasting involves uncertainty and additional complexities often emerge once we begin working on the projects. This is further complicated by the fact that the City owns critical infrastructure that needs to function during extended power outages where transitioning completely away from natural gas isn’t possible. In the past, staff have been able to leverage funding from GG0261 to make the greatest impact with the funding available. Given the size, variety, complexity and needs of our infrastructure, any funding provided means that more of the equipment that we replace during failure or at lifecycle is upgraded to the most efficient option. This funding would not be utilized to upgrading existing systems to be more efficient and save energy or reduce green house gasses.

To add a point of clarification for solar panels, solar PV systems are a way to get more productivity out of our existing facilities/assets. There has been a push for some solar projects where they make sense to reduce operating costs, reduce emissions and also take advantage of new capital incentives for solar PV installations that came out from the Independent Electricity System Operator at the start of this year. By increasing solar PV we are supporting energy reduction in the broader community, in alignment with the community call to climate action by putting less strain on the electric grid requiring less natural gas generation during peak times.

 
Reply