Carly Klassen
p. 50 of the council budget package
 
"A corridor review of several locations is planned to begin in 2026 to meet current Ontario design standards and to guide further implementation priorties in future years."
 
What is this exactly? How much does this cost? Is it mandatory?
Reply
Daisy Zhang DaisyZhang

The Cycling Master Plan (CMP) guides the development of Guelph’s cycling network. As part of this, a Corridor Review looks at major roads and routes to identify opportunities for bike lanes, multi-use paths, and other improvements. The current CMP was developed in 2013 and is now over a decade old. Since then, provincial design standards and local master plans have evolved significantly. An update to the CMP was originally budgeted for 2025 to align with modern standards and to integrate the 2022 Transportation Master Plan (TMP). This project was deferred last year through the capital prioritization process. New provincial rules could make it harder and more expensive for the City to build cycling projects as planned. This may also slow progress toward our TMP mode share targets, like increasing the number of trips made by bike.

A review of specific corridors is needed to identify where the planned cycling network may no longer be feasible and to identify alternate routes. The 2022 TMP sets a goal for 10% of all trips to be made by bike. Achieving this requires continued investment in completing the City’s cycling network.

This work is not mandatory in that it is not prescribed by the Province.  

There is sufficient budget in RD0385 to complete this work at the project team’s estimated project cost.Procurement is anticipated before the end of 2025 with prior approved budget and work will begin in 2026. Capital project RD0385 Cycling Master Plan Implementation 2026 budget of $250 thousand will fund design and construction of bike facilities and neighbourhood bike routes within road right-of-way, intersection design improvements, and public end-of-trip facilities.

Reply