Rodrigo Goller
Per the budget website, "the City will fall short of its climate change goals in 2030 by a significant margin, with only approximately a 25% reduction in our Greenhouse gas (GHG) emissions compared to the 63% target."
 
 
City Council declared that we have a Climate Crisis and prioritized actions that would help us meet our carbon reduction targets. Now, budget changes have delayed funding of transitioning Guelph to 100% Renewable Energy.
 
We took a lot of time to consider and choose Masterplan priorities that would help the municipality and the wider City of Guelph to meet those goals, including investing in our active transportation network, expanding public transit, etc.
 
What specific actions that directly contributed to Guelph meeting our GHG reduction target by 2030 have been taken out of the budget? If Council could re-introduce items back into the budget - for example, the expansion of our Active Transportation Network, and improvements to our public transit routes - to keep us on track to meet our GHG reduction targets?
Reply
sdevost
The City of Guelph is a member of the UN Cities Race to Zero campaign (RTZ) which sets a 63% emissions reduction target against the 2018 baseline by 2030 and to become a zero carbon community by 2050. The RTZ targets apply to the whole community of Guelph. The City, as a corporation, recognizes it is a member of the community and has committed to, in the Future Guelph Strategic Plan 2024-2027, (9) Be a leader in climate action and (10) Empower the community to help create a sustainable city, and has therefore aligned Corporate emissions reduction targets.  
 
There are four key themes of work that are required to significantly reduce Corporate emissions to meet the RTZ targets. They were listed in the 2024-2027 Multi-Year Budget: Long-term financial strategies (https://guelph.ca/city-hall/budget-and-finance/city-budget/2024-2027-multi-year-budget/2024-2027-myb-long-term-financial-strategies/)  and include:
  • Guelph Transit electrification
  • 100RE initiatives - Facility energy retrofits and installing non-transit fleet electric charging infrastructure
  • Anaerobic digestion upgrades at Organic Waste Processing Facility to produce renewable natural gas
  • Water Resource Recovery Centre upgrade to produce renewable natural gas
 
and includes the estimated emissions reduction associated with each project.
 
 
The budget changes include funding for the Guelph Transit electrification work, however the other themes of work/Focus Projects have been removed from the budget and deferred beyond the 10-year forecast.  
The 2024-2027MYB had included the following funding amounts for 100RE Initiatives (GG0261) in the 10-year forecast, for a total of $17.35M over the 10-year period between 2025 to 2034:
  • 2025 to 2027: $1.15 million per year
  • 2028 to 2033: $1.65 million per year
  • 2034: $4 million  
 
As a result of the GG0261 funding deferral, the following work will not be implemented:  
  • Energy conservation and greenhouse gas reduction measures such as building energy retrofits (HVAC upgrades, lighting retrofits, building envelope upgrades, process equipment upgrades), fleet EV charging infrastructure, and renewable energy generation in support of 100RE and Race to Zero.
 
In 2025, staff are exploring a policy-focused approach to include this work in individual capital projects to ensure it is pursued and funded.
 
Moving forward, alternative capital funding sources or grant opportunities are required to implement the energy conservation and greenhouse gas reduction work noted above in situations where there is no budget allocated.
 
Regarding Active Transportation Networks and public transit routes, please note the following:
  • Deferred outside the 10-year capital budget are capital projects that included upgrading or adding cycling infrastructure for about 27 road segments for a total of about 35 km of network. The deferred projects were determined to not be: 1) critical links to supporting housing, 2) part of grant-funded projects, or 3) tied to critical infrastructure renewal projects, as per staff’s prioritization process. Where possible, staff will look for opportunities to implement interim cycling improvements within existing pavement widths, such as restriping or adding curbs and bollards to enhance existing bike lanes, using funds from the Cycling Master Plan Implementation budget.  
  • Furthermore, all new trail development has been paused for the next 10 years (with the exception of PK0224 Woolwich to Woodlawn Multi-Use Trail Construction due to receipt of grant funding); investments in the active transportation network to upgrade trails and on-road connections has been slowed; and, investments into sidewalk infill has also been slowed down. Progress will still occur but at a slower pace, which will likely impact how quickly we achieve our mode share targets.
  • There is not yet an accepted standard to calculate emissions reduced per km of infrastructure built, so it is difficult to quantify the impact toward achieving our RTZ goals, but by investing in active transportation networks, both on-road and trails, we are supporting residents to choose these modes over driving.  
  • Transit’s Future Ready Action Plan (various projects beginning with TC0064) implementation would result in more connected route network with increased service frequency, more convenient and direct trips by making use of the grid-like system. The goal of this plan is to increase the transit modal share and get people out of cars. With more routes and frequent services, public transit becomes a more convenient option for people, encouraging them to use it more often. Public transit systems, especially those powered by electricity, produce significantly fewer emissions per passenger compared to individual car travel.  
 
Reply
sdevost
Follow up question from Councillor Goller:
 
Had the $17.35M remained in the budget, what activities/projects would have been implemented in 2025, and at what cost for each activity/project?
Reply
sdevost
The 2024-2027 MYB had included the following funding amounts for GG0261 in the 10-year forecast, for a total of $17.35M over the 10-year period between 2025 to 2034:
  • 2025 to 2027: $1.15 million per year
  • 2028 to 2033: $1.65 million per year
  • 2034: $4 million
This funding is directed to energy conservation and greenhouse gas reduction measures such as building energy retrofits (HVAC upgrades, lighting retrofits, building envelope upgrades, process equipment upgrades), fleet EV charging infrastructure, and renewable energy generation in support of 100RE and Race to Zero. The $1.15M in 2025 would be directed to fossil fuel reduction initiatives such as HVAC upgrades (for example upgrading end of life roof top units at Evergreen Senior Centre to heat pumps) and bolstering the electrical grid through investing in solar PV (such as installing 100kW of solar PV at Claire Road Emergency Services Centre).
Reply
sdevost
Follow up question from Councillor Goller:
 
If Council were to re-introduce partial funding for the 100RE projects starting in 2025, which un-funded project would staff recommend as having the greatest impact for the Corporation and the Community?
Reply
sdevost
Refer to follow up response above (posted 11/25/2024). Replacing natural gas consuming HVAC equipment with heat pumps to replace end of life assets as well as other measures to reduce natural gas usage is the most effective means to directly reduce greenhouse gas emissions. Solar investments and electrical energy conservation increase the electrical grid capacity and allow for more electrification in the community to transition away from natural gas and other fossil fuels.
Reply
Reply