In the Guelph Trail Masterplan (https://guelph.ca/wp-content/uploads/Guelph-Trail-Master-Plan.pdf), priority project #5 aims to connect the GID lands to downtown Guelph. It’s my understanding that there was $600k in the budget for 2025 and 2026, which have since been removed from the budget.
 
As I understand it, the project is now pending the Woods development, as trail connections will only be getting built when they are tied to developments. The concern raised by members of GCAT is that if we wait for the Woods Development to build the trail on their property, that would only connect Duke to Huron Streets. The connection between Downtown and Duke street, and more importantly, the connection between Huron Street and Victoria Roads still needs to be developed. This has been identified as a priority trail connection that may well act as the active transportation link between the GID lands and Downtown Guelph.
 
Can you please help me understand – will the work with the Guelph Junction Railway to build a trail connection between Huron Street and Victoria Street continue in 2025, or is this work completely paused until after the Woods development is complete? If the project is completely on pause, what level of funding would be required in 2025 to move forward with planning in coordination with the Guelph Junction Railway, so the City is ready to build this active transportation connection?
Reply
sdevost

Through the 2024-2027 MYB Parks requested $100,000 in 2026 to begin preliminary investigations for the trail along the railway from Arthur Street to Stevenson Street. We also had $530,000 forecasted in 2028 for construction, though the amount is a placeholder until we refine cost estimates through the investigation. The segment from Stevenson Street to Victoria Road was forecasted beyond the 10-year timeframe. This funding was allocated in PK0125, which is a rolled-up capital account that funds many trail projects throughout the City.

 

As you are aware, all new trail projects are now deferred for a minimum of 10 years, with the exception of the Woodlawn to Woolwich trail, which has received grant funding.

 

There are two significant development sites along this planned trail from Arthur to Victoria: the Woods development and Imico. Woods is an active development file and staff have been collaborating with the developer on the trail location and design. Staff recommend continuing to work with developers along this trail on the design and implementation to ensure the trail integrates well through and adjacent to these developments. There are portions of this trail segment that will likely have to be initiated as City capital projects.

 

Before City staff initiate investigation of this trail, we would like to get some certainty on the Ward to Downtown Bridge (or the alternatives), which are being explored through the ongoing Macdonell Structures Environmental Assessment. This will help us understand whether the trail should be placed on the north or south side of the railway. We would also like to tender the Woodlawn to Woolwich trail (which is planned in 2025) to get comparable construction pricing to more accurately project costing for the Arthur to Victoria trail.

 

Given the above information we may want to consider this topic again as part of the 2026 budget confirmation processes.